During the last 70+ years of operation has strived to run a safe, high quality utility while serving our customers as top priority. Since CMU is locally owned, it has been able to offer some of the most competitive pricing in the region. Today, a kilowatt of electricity is sold just a ½ cent higher than it was first offered in 1935. CMU has worked hard to maintain its infrastructure. In 2003, CMU completed construction of a new 1.3 million gallon water treatment facility. The new facility is fed through interconnected pipelines from three different surface lakes. In 2006, CMU rebuilt the electric generating plant, installing two new diesel generators and switch gear. The standby electric plant is able to meet the full needs of the city. In 2007, CMU installed 14 miles of a 6” high pressure gas transmission line to meet the needs of new business.
Electricity
Name of local supplier .................................... Corning Municipal Utilities
Water
Name of local supplier .................................... Corning Municipal Utilities
Source of water ............................................................. Surface Lakes
Elevated storage capacity ...........................................1,200,000 gallons
Capacity of water plant .................................................. 1,300,000 gpd
Average consumption ....................................................... 450,000 gpd
Peak consumption ............................................................ 620,000 gpd
Natural Gas
Name of local supplier ..................................... Corning Municipal Utilities
Pipeline source ........................................... Kinder Morgan Gas Company
Sanitation
Type sewage treatment plant ........................................Activated Sludge
Percent of community served by sewer ............................................ 99%
Average load .................................................................... 352,000 gpd
Peak load ......................................................................... 543,000 gpd
Design capacity .............................................................. 2,350,000 gpd
Phone 641.322.3920
Email: tim@corningmu.com